Key Facts
- Client:
- Caddick Construction
- Capital Cost:
- TBC
- Size:
- 149 Units
- Location:
- Former Harworth Collier, Phase 2Bii
- Sector:
- Residential
- Status:
- Planning/Tender
Simpson Park
149 unit residential masterplan as part of the larger outline planning permission at the former Harworth Colliery site. This forms part of the same larger masterplan as Simpson Park 3A. The homes are proposed as build to rent homes and the vision for the site is to provide variety of two-, three- and four-bedroom semi-detached homes creating a safe and welcoming neighbourhood to meet local needs.
The masterplan provides links to the proposed green wheel to the south of the site and existing woodland to the south-east. It provides part of a bus route which links to the wider masterplan.
The development follows the guidance set out in ‘Buildings for a Healthy Life 12’.